Installation

Installation

Installation of Bi-Steel structures reduces the requirements for lifting plant and labour in scale and time.

Bi-Steel structures are designed to make installation as fast and simple as possible.  Most structures are delivered as modules which are lifted into position and connected using Surefast slot and lock connections, bolts or welding depending on the strength of connection needed.  Typically, a crane would be required to assemble the modules.

Once the modules are assembled and connected the middle of the Bi-Steel panels is filled with concrete.

Corus provides straightforward installation instructions supported by site supervision when appropriate.

Health and safety requirements are the same as for standard lifting of large steel sections.

 
Printer Friendly
Search the site
Contact
Corus Bi-Steel
Crowthorne Business Est
Crowthorne
Berks RG45 6AW
United Kingdom
T  +44 (0)1344 751670
F  +44 (0)1344 751671
bi-steel@ corusgroup.com
Related case studies
New Scotland Yard selects Bi-Steel
For perimeter security wall
Labour party conference
Bi-Steel protects delegates
Bi-Steel in use
On one of the largest military bases in the UK
Related topics
Corus Bi-Steel
Find out more
FAQs
Your questions answered
Site mapCorus GroupLegal notice